Quote:
Originally Posted by jason1202
BCA submission for Earth Retaining Super Structure will cost alot and it takes alot time for them to approve. Min 3 months.
Also, if nearby structure is to move just a bit, it will be a huge nightmare.
Do take note of the general contractor insurance coverage. Just in case.
|
We need to do the ERSS in front, pond or not as the slope we are cutting into is 6m high. It is as such a sunken cost for developing this plot. Submission going to go out next week.
Filter design plan. Think of it as a 30ft long sump
This is the mechanical separation stage and secondary bio. Primary bio is hidden behind the waterfall, and is half upflow and half bakki shower.